The Barajas project is the largest so far undertaken by the practice - more than one million square metres of buildings with a budget of around one billion Euros. The new terminal and satellite are designed to handle up to 35 million passengers annually, establishing Madrid as a major European hub, and are located some distance to the north-west of the existing terminal complex.
The new terminal features a clear progression of spaces for departing and arriving travellers. The building's legible, modular design creates a repeating sequence of waves formed by vast wings of prefabricated steel. Supported on central 'trees', the great roof is punctuated by roof lights providing carefully controlled natural light throughout the upper level of the terminal. Light-filled 'canyons' divide the parallel floors that accommodate the various stages of passenger processing - from point of arrival, through check-in and passport and security controls to departure lounges and, finally, to the aircraft.
A simple palette of materials and straightforward detailing reinforce the direct character of the architecture. Internally, the roof is clad in bamboo strips, giving it a smooth and seamless appearance. In contrast, the structural 'trees' are painted to create a kilometre-long vista of graduated colour. The lower levels of the building house baggage handling, storage and plant areas, and offer a striking contrast with the lightweight transparency of the passenger areas above
Key points
City & Context
The new terminal will establish Madrid as a major European hub, and consolidate its position as the focal connection between Europe and Latin America.
Legibility
A straight forward linear diagram and a clear progression of spaces for departing and arriving passengers contribute to the legibility and usability of the terminal for passengers and workers alike.
Energy
While no specific environmental criteria were stipulated in the brief, the design team set out to maximise natural daylight to all passenger areas and reduce dependence on artificial light, while providing views out and reducing solar gain with extensive external shading.
Related Information
Press
Madrid Barajas Airport Feature
On Site: New Architecture in Spain
Madrid Barajas Airport Opening
See all Press & News for this project
Project
See all other Transport projects
Location
See all other projects in Madrid
See all other projects in Spain
Press Pack
All images included in these Press Packs are screen resolution only and no rights of reproduction are given, please contact Communications regarding usage
Press Release (PDF, 331 KB)
Images (PDF, 1199 KB)
Drawings (PDF, 1067 KB)
Job Sheet
Madrid Barajas Airport (PDF, 845 KB)
Work
Anterp Law Courts - Completed
(Material / Timber)
Mossbourne Community Academy - Occupation
(Material / Timber)
Copyright © 2010 Rogers Stirk Harbour + Partners. All rights reserved.












