Debating chamber natural ventilation funnel with mirrored reflector

The new airport will be formally opened by the Spanish Prime Minister, Jose Luis Rodriguez Zapatero on Saturday 4 February 2006.

The New Terminal Area (NAT), designed by a consortium of Richard Rogers Partnership, the Spanish practice Estudio Lamela and two engineering companies TPS and Initec, will establish Madrid as a major European hub, and consolidate its position as the focal connection between Europe and Latin America. It is expected that the new terminal will accommodate between 65 and 70 million passengers per annum. Passenger numbers are expected to outstrip Schiphol in the Netherlands, Europe’s second largest airport, in five years time. With a total area of 1,200,000 sq m, the NAT is one of the largest buildings in Europe and will have a significant urban, economic and social impact on both Madrid and Spain itself.

Responding to the demands of 21st-century travel, the New Terminal at Barajas will be efficient, economic and functional, accommodating anticipated growth in passenger traffic, which could be up to 35 million per annum in 2010 and 50 million in 2020, doubling the capacity of the old airport.

The design process has focused on delivering an improved passenger experience, creating an attractive, peaceful atmosphere. This led to the utilisation of materials and finishes which would convey a sense of calm. The simple palette of materials and the use of a kit-of-parts approach to detailing reinforce the simplicity of the architectural concept. Despite the size of the building, it still allows passengers to easily orientate themselves easily using the many visual references. A straightforward linear diagram and a clear progression of spaces for departing and arriving passengers contribute to the legibility and usability of the terminal for passengers and workers alike.



Notes for Editors


THE DESIGN COMPETITION
 

Madrid Barajas Airport opened in 1933 and was subsequently extended several times. By the early ‘90s, the existing airport had become over-stretched and the need for a terminal, satellite, ancillary buildings and two new runways in the north-west was identified. The client, the Spanish National Airports Authority (AENA) initiated an international competition which was won by a consortium of Richard Rogers Partnership, the Spanish practice Estudio Lamela and two engineering companies TPS and Initec in 1997. The design was chosen for it simplicity, adaptability and flexibility, allowing for future changes and extensions.



AIMS OF THE DESIGN


The design selected by AENA has four basic principles:


Integration into the landscape

Airport terminals are normally surrounded by secondary elements (car parks, power plants etc.) that obscure orientation through the airport. In this design, such structures are integrated into the main building, taking into account the topography of the local area. The canyons – large courtyards full of daylight - establish a sequence that incorporates the landscape into the interior space.


Energy

Despite the extreme heat of summer in Madrid, the design team were committed to the use of passive environmental systems wherever possible, while maximising transparency and views towards the aircraft and the mountains beyond. The building benefits from a north-south orientation with the primary facades facing east and west – the optimum layout for protecting the building against solar gain. The facades are protected by a combination of deep roof overhangs and external shading. A low energy displacement ventilation system is used in the pier, and elsewhere a more conventional high velocity system is used. Given the multi-level section, a strategy was also needed to bring natural light down into the lower levels. The solution is a series of light-filled ‘canyons’. The canyons are spectacular full-height spaces, spanned by bridges in which arriving and departing passengers, though segregated, can share the drama of the imposing space.


Spatial Clarity

Barajas is a model of legibility, with a straightforward linear diagram and a clear progression of spaces for departing and arriving passengers. The accommodation is distributed over six floors; three above ground for check-in, security, boarding and baggage reclaim, and three underground levels for maintenance, baggage processing and transferring passengers between buildings. The flow of passengers starts in the forecourt and goes through the check-in counters and the security control until the boarding lounge.


Flexibility

The layout proposed is adaptable to all activities at the airport, maintaining a strong architectural identity through all stages of the project, with a view to the need for potential extensions of the buildings.



GENERAL DESCRIPTION OF THE PROPOSAL
 

The NAT (T4) at the International Madrid-Barajas Airport is located three kilometres north of the old Barajas terminals TI, T2 and T3. The original design concept has been adhered to and the final building responds to the complex and extensive requirements of the specification, organising activity within three buildings:

  • A car park measuring 310,000 sq m, with capacity for 9,000 spaces.
  • A Terminal Building is separated from the car park by forecourts, which act as a transport exchange for buses, taxis, metro, trains and private vehicles. It will serve international flights and Shengen flights (flights within European Union countries). With nearly 500,000 sq m (distributed over six levels), it has 174 check-in counters, 38 stands for planes and airport walkways located in the boarding pier that measures 1.2 km.
  • The Satellite Building located between the new runways (2 km from the main terminal building), houses all international non-Shengen flights from the NAT. There will also be a flexible area which will serve all flight routes: non¬¬-Shengen, international, national and Shengen (complementing the terminal building). The building is almost 300,000 sq m and 26 stands for airplanes. If the air traffic continues its increase, there is the possibility to build a second satellite.

The car park building is composed of six modules, functionally independent, but that appear as one unit by means of exterior cladding and a garden roof of 56,000 sq m. Direct access to the car park from the road is made through one of the six guarded level-crossings, where every vehicle is automatically assigned a car park space. From the car park the terminal building is entered by means of a connecting pedestrian walkway. Both buildings, the car park and the terminal, are separated by the forecourts. The forecourts are made of a series of roads and aprons at different levels, all covered by the extension of the wavy roof of the Terminal.

The Terminal Building is characterised by three lineal modules (Check-in spine, Processing spine, Pier), and serves different functions according to the passengers flow (arrivals or departures). Reception of passengers, check-in counters, control and boarding for departure flights; disembark, luggage collection and departure of passengers from the building for arrival flights.

These modules are separated from each other by light-filled canyons that provide natural illumination to the lower levels of the building. This contributes to the environmental strategy – reducing the energy consumption. In addition, this also reduces the maintenance and upkeep costs. In these spaces, the vertical movement of passengers takes place, via stairs, ramps or lifts. These are a very important element for the orientation of the passenger as they indicate the sequence of actions that the passenger needs to carry out when arriving or departing.

There are several factors which led to the need for a remote Satellite building. It was necessary to create a building that could for security reasons separate the passenger flows in non-Shengen flights. In order to do this, the pier of the Satellite has been provided with an elevated spine (level +2) where the flow of non-¬Shengen and international arrivals can be isolated.

The Terminal and Satellite buildings are separated due to aeronautical reasons, responding to the layout of the two new runways, aircraft taxi lanes and aircraft stands. The two buildings are connected by a tunnel that runs under the runways. The tunnel has two levels with three chambers in each level. The upper level has two side areas of approximately 10 metres width for the circulation of authorised vehicles and a central space of 13 metres, where the Automatic People Mover (APM). The lower section, with three spaces of identical dimensions, is totally devoted to the automatic baggage handling system (SATE).

Regardless of the type of flight, all the passengers who use the NAT Barajas have to go through the Terminal building as all checking-in and luggage collection are concentrated in here. The use of the APM systems (lifts, escalators and travelators) together with SATE allows the simultaneous movement of both, luggage and passengers. In this way the Satellite building is mainly reserved for the security controls of the international flights and for the boarding/disembark of this kind of flight. There is direct access to the Satellite from the exterior roads but it is reserved for authorised staff, not for airport users.

The New Barajas will have the capacity to move 18,000 at peak periods. Despite the size of the project, the design of the NAT Barajas offers a functional and comfortable area for the passenger, an urban and architectural space with human scale both externally and internally and a harmony with the surroundings, minimising the environmental impact.



KEY CHARACTERISTICS OF THE PROJECT


Architecturally, the project intends to demonstrate:

  • The idea that an airport can not only service significant volumes of air traffic but also form part of an integrated piece of urban development, associated with the interchange of passengers between various modes of transport – planes, trains, metro, bus, taxi and car.
  • An architectural solution which passengers can easily read, simplifying the travel process.
  • That the main building reflects the sequential character of the passenger processing through the separation of the different functional volumes or modules.
  • Each longitudinal block is separated from the next by means of the light-filled canyons. These canyons represent the separation between the different stages in the processing of the passengers, providing clear means of orientation and introducing natural light into the interior of the building, improving the quality and perception of the space.
  • A relaxed and bright atmosphere inside the building, reflecting the surrounding environment. The wavy roof of bamboo accompanies passengers throughout their journey through the interior of the building. The outward appearance is also light and transparent, creating a strong visual connection between the outside and the inside.
  • Easy access to the airport development as well as a good internal connections with the vehicle car parks and public transport, both in departures and arrivals.
  • Flexible and modular construction, with the potential to grow in both directions: longitudinal and transversal. Good quality/price relation, the repetitive modular systems allowing the inclusion of singular elements with special designs.
  • The provision of an easy adjustment to future aeronautical developments.
  • Low energy consumption as well as the possibility to use new clean alternative energies when possible.


A 21st-CENTURY AIRPORT
 

The new generation of terminals must offer airline companies the best base for operations and make it possible for them to exploit the potential of air alliances. Likewise, they should satisfy the new demands of users for environmental quality, passenger service and connection with other means of transport.

The New Terminal Building should quickly adapt to economic and social changes and have the capacity to implement new technologies, whilst respecting the environment.


NAT Barajas will:

  • Create a high quality gateway into Spain – and Europe – through its design and functionality.
  • Operate as an important European hub that provides connections between flights, minimising waiting times.
  • Compete with other terminal buildings at hub airports, such as Charles de Gaulle, Schiphol, Frankfurt, Heathrow, or new generation airports such as, Chep Lap Kok, Kuala Lumpur, Kansai and Denver among others.
  • Adapt to potential changes in the handling of operations and, in particular, to create a cost efficient management of the planned infrastructures.

As a 21st-century airport, the New Terminal at Barajas will be efficient, simple, economic and functional, accommodating anticipated growth in passenger traffic, which could be up to 35 million per annum in 2010 and 50 million in 2020, double the capacity of the old airport.

The new NAT is located only three kilometres from the old terminals and, after public transportation links have been completed, will be only 15 minutes by underground from the city centre (*), enhancing Madrid’s prominence as a major cosmopolitan centre and prime transport hub. When the new Barajas Airport is fully operational, there will be a workforce of 20,000 on site each day.

(*)The works for the connection with the Metro network have not yet been carried out, but the new buildings already have the necessary station and services.


End



For further information, images etc, please call:

Vicky Smith – 07868840232

or Jenny Stephens

Communications Dept

tel + 020 7746 0327

email Vicky.s@rrp.co.uk / jenny.s@rrp.co.uk

 

 
 

Copyright © 2010 Rogers Stirk Harbour + Partners. All rights reserved.