Daimler Chrysler Residential

Daimler Chrysler Residential

The three buildings designed by RRP for Daimler Chrysler on Berlin's Linkstraße form part of the the Potsdamer Platz masterplan by Renzo Piano. B8 is predominantly residential, with retail areas on the ground, first and second floors.

In the original masterplan the three buildings are shown as closed blocks measuring c. 50 m square, but the RRP design opens up the south-east side of the blocks facing the park. This building form allows light to penetrate into the courtyard, atrium and internal spaces, as well as providing all flats with unobstructed views out over the park.

The ratio of glazing areas to solid wall construction is determined by the orientation and analysis of heat losses and solar gains. Whereas the north-east and north-west façades have comparatively little glazing in order to minimise heat loss during the winter months, the south-west and south-east elevations is generously glazed, with living areas opening onto the garden courtyard.

Conservatories or ‘winter gardens’ adjacent to these living areas maximise the passive use of solar energy. The ‘winter gardens’ act as direct solar gain spaces and buffer zones, with pre-heated air used to ventilate or warm the internal accommodation space in winter. Sun shading provided by aluminium louvres on sliding tracks prevents overheating in summer.

The double-height penthouses are fully glazed to the courtyard side. The glazing system is supported by a water-filled steel structure which acts as a radiator during the winter. Electronically operated sun-shading devices and opening windows minimise solar gain and maximise natural ventilation during the summer.

Awards
RIBA Award for Buildings in Europe 2000
   
Location Berlin, Germany
Type Residential
Dates 1993 - 1999
   
Client Daimler Chrysler debis Immobilienmanagement
   
The Architect Richard Rogers Partnership
   
Team  
Laurie Abbott, Yasmin Al-Ani-Spence, Michael Barth, Elliot Boyd, Sabine Coldrey, Hal Currey, Mike Davies, Barbara Faigle, Rowena Fuller, Marco Goldschmied, Lennart Grut, James Leathem, Nick Malby, Tina Manis, Richard Paul, Robert Peebles, Kim Quazi, Richard Rogers, Neil Southard, Martin White, John Young
   
Acoustic Consultant Müller BBM GmbH
Facade Consultant Institut für Fassadentechnik IFFT
Main Contractor Schmidt-reuter und Partner
Quantity Surveyor Davis Langdon & Everest
  Drees & Sommer AG
Services Engineer Rp + k Sozietät
Structural Engineer Ove Arup and Partners
  Knebel & Schumacher